
Project Overview
Supply and install new Barrier, post for ANPR camera and ANPR camera.
All works were completed on 21/10/2025.
Works Completed
- Supplied and installed the new barrier system during the first visit
- Wired the barrier into the existing services and carried out full commissioning
- Left the barrier safely isolated to allow the access‑control engineers to complete their works
- Confirmed smooth operation of the barrier prior to isolation and ensured the site was left tidy
Second visit to follow: installation of the ANPR camera system



